Until the Federal Energy Regulatory Commission issues new licenses for the Projects, Great River Hydro will maintain a virtual Public Information Library through this public website where copies of the Notice of Intents (NOIs), Pre-Application Documents (PADs), supporting materials, and unrestricted published studies will be kept. Access to these materials will be open except for sensitive information as described in section 1.4.5.1. of the PADs.
A computer terminal accessing the website and the virtual Public Information Library will be maintained at the Great River Hydro office at 2 Killeen Street, North Walpole, New Hampshire. Access to the facility is controlled and requires an escort and advance notice by contacting Mr. John Ragonese.
Thumb | Name | Size |
---|---|---|
Public-Information-Library/Comprehensive-Plans/
Comprehensive-Plans
directoryComprehensive-Plans Open 143.75 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
49 Items | |
Public-Information-Library/Formal-Existing-License-Documents/
Formal-Existing-License-Documents
directoryFormal-Existing-License-Documents Open 87.47 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
24 Items | |
Public-Information-Library/Supporting-Study-Reports-and-Documents/
Supporting-Study-Reports-and-Documents
directorySupporting-Study-Reports-and-Documents Open 188.14 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
64 Items |
0
Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.
© 2024 Great River Hydro, LLC