• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
📁 Home → 📁 80-Amended-Final-License-Applications-AFLA → 📁 60-FERC-Additional-Information-Requests ↓
ThumbNameSize
Thumb Documents/80-Amended-Final-License-Applications-AFLA/60-FERC-Additional-Information-Requests/1st-AIR/ 1st-AIR

directory1st-AIR

Open 494.57 MB 2021-12-10 December 10, 2021 2023-06-15 June 15, 2023
20 Items
Thumb Documents/80-Amended-Final-License-Applications-AFLA/60-FERC-Additional-Information-Requests/2nd-AIR/ 2nd-AIR

directory2nd-AIR

Open 51.63 MB 2021-05-11 May 11, 2021 2023-06-15 June 15, 2023
5 Items
Thumb Documents/80-Amended-Final-License-Applications-AFLA/60-FERC-Additional-Information-Requests/3rd-AIR/ 3rd-AIR

directory3rd-AIR

Open 313.49 KB 2021-07-28 July 28, 2021 2023-06-15 June 15, 2023
1 Items
Thumb 2021-01-28-FERC-GRH-Telephone-Memo.docx

application/vnd.openxmlformats-officedocument.wordprocessingml.document2021-01-28-FERC-GRH-Telephone-Memo.docx

Download Copy Link 36.87 KB 2021-05-05 May 5, 2021 2021-03-04 March 4, 2021
36.87 KB
Thumb 2021-02-05-FERC-GRH-Telephone-Memo-2.docx

application/vnd.openxmlformats-officedocument.wordprocessingml.document2021-02-05-FERC-GRH-Telephone-Memo-2.docx

Download Copy Link 34.55 KB 2021-05-05 May 5, 2021 2021-03-04 March 4, 2021
34.55 KB
Thumb 2021-04-30-FERC-ltr-SDR-Waiver-Denied.pdf

application/pdf2021-04-30-FERC-ltr-SDR-Waiver-Denied.pdf

Open Download Copy Link 249.29 KB 2021-05-05 May 5, 2021 2021-04-30 April 30, 2021
249.29 KB
Thumb 2021-06-24-PUBLIC-GRH-Ltr-AFLA-Exhibit-F-SDRs.pdf

application/pdf2021-06-24-PUBLIC-GRH-Ltr-AFLA-Exhibit-F-SDRs.pdf

Open Download Copy Link 243.78 KB 2021-06-28 June 28, 2021 2021-06-28 June 28, 2021
243.78 KB

4

2914340fdf

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2024 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact