Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.
The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.
The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.
Thumb | Name | Size |
---|---|---|
Documents/40-Study-Plans/10-Revised-Study-Plan/
10-Revised-Study-Plan
directory10-Revised-Study-Plan Open 35.34 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
16 Items | |
Documents/40-Study-Plans/20-Proposed-Study-Plan/
20-Proposed-Study-Plan
directory20-Proposed-Study-Plan Open 142.61 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
43 Items | |
Documents/40-Study-Plans/30-Study-Plan-Determinations/
30-Study-Plan-Determinations
directory30-Study-Plan-Determinations Open 236.33 KB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
3 Items | |
Documents/40-Study-Plans/40-Final/
40-Final
directory40-Final Open 1.66 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
11 Items |
0