Special COVID-19 Announcement: Recreation areas will be open for 2021 season.

  • Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1 947d131ca2 Documents/40-Study-Plans/40-Final 3dcfc9d988
Home / 40-Study-Plans / 40-Final
ThumbNameSize
ThumbStudy-Plan-Determination

Study-Plan-Determination

Open
2 Items
Thumb01-09-14-USFWS-ltr-Comments-on-use-of-hydroacoustics.pdf

01-09-14-USFWS-ltr-Comments-on-use-of-hydroacoustics.pdf

Open | Download | Copy Link
93.82 KB
Thumb01-10-14-TC-ltr-Relicensing-RSP-Comment-Hydroacoustic.pdf

01-10-14-TC-ltr-Relicensing-RSP-Comment-Hydroacoustic.pdf

Open | Download | Copy Link
81.2 KB
Thumb09-24-2013-TC-ltr-Clarification-Request-on-FERC-SP-Determination.pdf

09-24-2013-TC-ltr-Clarification-Request-on-FERC-SP-Determination.pdf

Open | Download | Copy Link
118.16 KB
Thumb11-21-13-FERC-ltr-LC-Relicensing-Study-4-EOT-granted.pdf

11-21-13-FERC-ltr-LC-Relicensing-Study-4-EOT-granted.pdf

Open | Download | Copy Link
32.56 KB
Thumb11-26-13-FERC-tech-mtg-re-VY-closure---transcript.pdf

11-26-13-FERC-tech-mtg-re-VY-closure---transcript.pdf

Open | Download | Copy Link
368.44 KB
Thumb12-31-13-TC-ltr-Revision-to-ILP-RSP.pdf

12-31-13-TC-ltr-Revision-to-ILP-RSP.pdf

Open | Download | Copy Link
621.76 KB
ThumbFERC-Response-to-TC-Request-for-Clarification-on-SP-Determination-09-24-2013.pdf

FERC-Response-to-TC-Request-for-Clarification-on-SP-Determination-09-24-2013.pdf

Open | Download | Copy Link
118.16 KB
ThumbTC-Request-for-EOT-re-Determination-on-SP4.pdf

TC-Request-for-EOT-re-Determination-on-SP4.pdf

Open | Download | Copy Link
49.57 KB

9

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact