• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
📁 Home → 📁 20-NOI-and-PAD → 📁 20-Bellows-Falls-Project-P-1855 ↓
ThumbNameSize
Thumb 10-30-12-Bellows-Falls-Project-Pre-Application-Document.pdf

10-30-12-Bellows-Falls-Project-Pre-Application-Document.pdf

Open Download Copy Link 12.46 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
12.46 MB
Thumb 10-30-12-Bellows-Falls-Project-Pre-Application-Document_Efiled.pdf

10-30-12-Bellows-Falls-Project-Pre-Application-Document_Efiled.pdf

Open Download Copy Link 10.34 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
10.34 MB
Thumb 10-30-12-TC-ltr-BF-NOI-PAD-Transmittal.pdf

10-30-12-TC-ltr-BF-NOI-PAD-Transmittal.pdf

Open Download Copy Link 592.03 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
592.03 KB
Thumb 10-31-12-Bellows-Falls-Project-Notice-of-Intent.pdf

10-31-12-Bellows-Falls-Project-Notice-of-Intent.pdf

Open Download Copy Link 123.61 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
123.61 KB
Thumb Distribution-List---Bellows-10-29.pdf

Distribution-List---Bellows-10-29.pdf

Open Download Copy Link 227.5 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
227.5 KB

5

b0cb1bca48

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact