• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
📁 Home → 📁 50-Study-Reports → 📁 130-Study-Reports-1-33 → 📁 Study-27-Floodplain-Wetland-Riparian-and-Littoral-Vegetation ↓
ThumbNameSize
Thumb 11-30-16-TC-Study-27-Supplement.pdf

application/pdf11-30-16-TC-Study-27-Supplement.pdf

Open Download Copy Link 70.05 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
70.05 KB
Thumb Study-27-cover-types-IDs.pdf

application/pdfStudy-27-cover-types-IDs.pdf

Open Download Copy Link 32.41 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
32.41 KB
Thumb TC-Study-27-Terrestrial-Vegetation-Habitats-Filed-2015-09-14.pdf TC-Study-27---Terrestrial-Vegetation-Habitats-Filed-2015-09-14.pdf

application/pdfTC-Study-27---Terrestrial-Vegetation-Habitats-Filed-2015-09-14.pdf

Open Download Copy Link 16.47 MB 2023-06-15 June 15, 2023 2021-02-15 February 15, 2021
16.47 MB
Thumb TC_Study27_SHP_022217_ARC.zip

application/zipTC_Study27_SHP_022217_ARC.zip

Download Copy Link 8.06 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
8.06 MB
Thumb TC_Study27_SHP_022217_KMZ.zip

application/zipTC_Study27_SHP_022217_KMZ.zip

Download Copy Link 10.15 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
10.15 MB
Thumb TransCanada_Study27_Final_Report-2016-08_01.pdf

application/pdfTransCanada_Study27_Final_Report-2016-08_01.pdf

Open Download Copy Link 16.29 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
16.29 MB

6

ce7f5a75b4

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2024 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact