• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
📁 Home → 📁 50-Study-Reports → 📁 130-Study-Reports-1-33 → 📁 Study-19-American-Eel-Downstream-Passage ↓
ThumbNameSize
Thumb 02-28-17-TC-Study-19-Appendix-F.xlsx

application/vnd.openxmlformats-officedocument.spreadsheetml.sheet02-28-17-TC-Study-19-Appendix-F.xlsx

Download Copy Link 71.95 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
71.95 KB
Thumb 02-28-17-TC-Study-19-Final-Report.pdf

application/pdf02-28-17-TC-Study-19-Final-Report.pdf

Open Download Copy Link 16.18 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
16.18 MB
Thumb 04-14-17-Study-19-Appendix-F-Revised.xlsx

application/vnd.openxmlformats-officedocument.spreadsheetml.sheet04-14-17-Study-19-Appendix-F-Revised.xlsx

Download Copy Link 74.51 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
74.51 KB
Thumb 08-31-16-TC-May-2016-USR-Spplement-Study-19-Discharge-Data.xlsx

application/vnd.openxmlformats-officedocument.spreadsheetml.sheet08-31-16-TC-May-2016-USR-Spplement-Study-19-Discharge-Data.xlsx

Download Copy Link 127.02 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
127.02 KB
Thumb TransCanada_Study19_Eel_Downstream_Report_2016_05_16.pdf

application/pdfTransCanada_Study19_Eel_Downstream_Report_2016_05_16.pdf

Open Download Copy Link 10.9 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
10.9 MB

5

fad993399e

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2024 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact