Special COVID-19 Announcement: Recreation areas will be open for 2021 season.

  • Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1 07bf3fbd98 Documents/50-Study-Reports/130-Study-Reports-1-33/Study-12-Tessellated-Darter-Survey 008405606d
Home / 50-Study-Reports / 130-Study-Reports-1-33 / Study-12-Tessellated-Darter-Survey
ThumbNameSize
ThumbTC_S12_Darter_Survey_Report_2016_03_01.pdf

TC_S12_Darter_Survey_Report_2016_03_01.pdf

Open | Download | Copy Link
7.58 MB
ThumbTC_S12_Study_Report_Appendices.xlsx

TC_S12_Study_Report_Appendices.xlsx

Download | Copy Link
126.47 KB
ThumbTransCanada_Study12_Appendices_A_E_2016_08_01.xlsx

TransCanada_Study12_Appendices_A_E_2016_08_01.xlsx

Download | Copy Link
216.47 KB
ThumbTransCanada_Study12_Appendix_F_Geodata_2016_08_01_ARC.zip

TransCanada_Study12_Appendix_F_Geodata_2016_08_01_ARC.zip

Download | Copy Link
30.66 KB
ThumbTransCanada_Study12_Appendix_F_Geodata_2016_08_01_kmz.zip

TransCanada_Study12_Appendix_F_Geodata_2016_08_01_kmz.zip

Download | Copy Link
28.25 KB
ThumbTransCanada_Study12_Final_ARCGIS_2016_03_01.zip

TransCanada_Study12_Final_ARCGIS_2016_03_01.zip

Download | Copy Link
25.49 KB
ThumbTransCanada_Study12_Final_Report_2016_08_01.pdf

TransCanada_Study12_Final_Report_2016_08_01.pdf

Open | Download | Copy Link
22.21 MB

7

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact