Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.
The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.
The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.
Thumb | Name | Size |
---|---|---|
TC_S12_Darter_Survey_Report_2016_03_01.pdf
TC_S12_Darter_Survey_Report_2016_03_01.pdf Open | Download | Copy Link | 7.58 MB | |
TC_S12_Study_Report_Appendices.xlsx
TC_S12_Study_Report_Appendices.xlsx Download | Copy Link | 126.47 KB | |
TransCanada_Study12_Appendices_A_E_2016_08_01.xlsx
TransCanada_Study12_Appendices_A_E_2016_08_01.xlsx Download | Copy Link | 216.47 KB | |
TransCanada_Study12_Appendix_F_Geodata_2016_08_01_ARC.zip
TransCanada_Study12_Appendix_F_Geodata_2016_08_01_ARC.zip Download | Copy Link | 30.66 KB | |
TransCanada_Study12_Appendix_F_Geodata_2016_08_01_kmz.zip
TransCanada_Study12_Appendix_F_Geodata_2016_08_01_kmz.zip Download | Copy Link | 28.25 KB | |
TransCanada_Study12_Final_ARCGIS_2016_03_01.zip
TransCanada_Study12_Final_ARCGIS_2016_03_01.zip Download | Copy Link | 25.49 KB | |
TransCanada_Study12_Final_Report_2016_08_01.pdf
TransCanada_Study12_Final_Report_2016_08_01.pdf Open | Download | Copy Link | 22.21 MB |
7