Special COVID-19 Announcement: Recreation areas will be open for 2021 season.

  • Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1 07bf3fbd98 Documents/50-Study-Reports/130-Study-Reports-1-33/Study-06-Water-Quality-Monitoring 008405606d
Home / 50-Study-Reports / 130-Study-Reports-1-33 / Study-06-Water-Quality-Monitoring
ThumbNameSize
Thumb12-15-16-TC-Study-06-Final-Report-and-App-A-and-B.pdf

12-15-16-TC-Study-06-Final-Report-and-App-A-and-B.pdf

Open | Download | Copy Link
4.55 MB
Thumb12-15-16-TC-Study-06-Final-Report-App-C-through-J.pdf

12-15-16-TC-Study-06-Final-Report-App-C-through-J.pdf

Open | Download | Copy Link
27.83 MB
Thumb12-15-16-TC-Study-06-Final-Report-App-K-through-P.pdf

12-15-16-TC-Study-06-Final-Report-App-K-through-P.pdf

Open | Download | Copy Link
19.7 MB
ThumbTC_S06_Water_Quality_Report_2016_03_01.pdf

TC_S06_Water_Quality_Report_2016_03_01.pdf

Open | Download | Copy Link
40.22 MB
ThumbTransCanada_Study06_Appendix_N_Geodata_2016_08_01_ARC.zip

TransCanada_Study06_Appendix_N_Geodata_2016_08_01_ARC.zip

Download | Copy Link
4.6 KB
ThumbTransCanada_Study06_Appendix_N_Geodata_2016_08_01_kmz.zip

TransCanada_Study06_Appendix_N_Geodata_2016_08_01_kmz.zip

Download | Copy Link
3.35 KB
ThumbTransCanada_Study06_Final_Report-_2016_08_01.pdf

TransCanada_Study06_Final_Report-_2016_08_01.pdf

Open | Download | Copy Link
47.94 MB
ThumbTransCanada_Study06_StudySites_Final_ARCGIS_2016_03_01.zip

TransCanada_Study06_StudySites_Final_ARCGIS_2016_03_01.zip

Download | Copy Link
4.02 KB

8

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact