Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.
The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.
The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.
Thumb | Name | Size |
---|---|---|
2024-04-10-GRH-Intervention-on-FL.pdf
application/pdf2024-04-10-GRH-Intervention-on-FL.pdf Open Download Copy Link 173.03 KB 2024-04-11 April 11, 2024 2024-04-10 April 10, 2024 |
173.03 KB | |
2024-04-23-Town-of-Vernon.pdf
application/pdf2024-04-23-Town-of-Vernon.pdf Open Download Copy Link 555.29 KB 2024-04-23 April 23, 2024 2024-04-23 April 23, 2024 |
555.29 KB | |
2024-05-06-FL-Intervention-on-GRH.pdf
application/pdf2024-05-06-FL-Intervention-on-GRH.pdf Open Download Copy Link 230.85 KB 2024-05-16 May 16, 2024 2024-05-07 May 7, 2024 |
230.85 KB | |
2024-05-13-American-Whitewater_AMC-Intervention-and-Comments.pdf
application/pdf2024-05-13-American-Whitewater_AMC-Intervention-and-Comments.pdf Open Download Copy Link 2.37 MB 2024-05-16 May 16, 2024 2024-05-13 May 13, 2024 |
2.37 MB |
4