Special COVID-19 Announcement: Recreation areas will be open for 2021 season.

  • Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1 a699110039 Documents/10-Process ecb7361262
Home / 10-Process
ThumbNameSize
Thumb02-03-22-GRH-Comment-on-FL-REA-Delay-Request.pdf

02-03-22-GRH-Comment-on-FL-REA-Delay-Request.pdf

Open | Download | Copy Link
217.12 KB
Thumb02-15-18-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

02-15-18-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

Open | Download | Copy Link
52.02 KB
Thumb02-22-17-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

02-22-17-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

Open | Download | Copy Link
15.98 KB
Thumb09-03-14-TC-Initial-Study-Report-Meeting-Announcement.pdf

09-03-14-TC-Initial-Study-Report-Meeting-Announcement.pdf

Open | Download | Copy Link
96.01 KB
Thumb11-27-13-FERC-ltr-LC-Relicensing-seeking-APE-SHPO-concurrence.pdf

11-27-13-FERC-ltr-LC-Relicensing-seeking-APE-SHPO-concurrence.pdf

Open | Download | Copy Link
12.05 KB
Thumb12-04-13-FERC-maps-associated-with-FERC-11-27-13-letter.pdf

12-04-13-FERC-maps-associated-with-FERC-11-27-13-letter.pdf

Open | Download | Copy Link
4.1 MB
Thumb12-13-13-FERC-ltr-Interim-ILP-schedule-for-SP-Determination.pdf

12-13-13-FERC-ltr-Interim-ILP-schedule-for-SP-Determination.pdf

Open | Download | Copy Link
18.41 KB
Thumb20131008-FERC-Postponement-of-Oct-15-Technical-Mtg.pdf

20131008-FERC-Postponement-of-Oct-15-Technical-Mtg.pdf

Open | Download | Copy Link
10.75 KB
ThumbFERC-Memo---ILP-Schedule-Adjustment-2013-08-14.pdf

FERC-Memo---ILP-Schedule-Adjustment-2013-08-14.pdf

Open | Download | Copy Link
10.59 KB
ThumbFERC-revised-meeting-schedule-re-SP-determ-and-VY-closure.pdf

FERC-revised-meeting-schedule-re-SP-determ-and-VY-closure.pdf

Open | Download | Copy Link
10.01 KB
ThumbILP-Study-Criteria-Summary.pdf

ILP-Study-Criteria-Summary.pdf

Open | Download | Copy Link
13.83 KB
ThumbIntegrated-Licensing-process-reduced.pdf

Integrated-Licensing-process-reduced.pdf

Open | Download | Copy Link
181.6 KB
ThumbRevised-Process-Plan-and-Schedule-for-CT-RIver-relicensing.pdf

Revised-Process-Plan-and-Schedule-for-CT-RIver-relicensing.pdf

Open | Download | Copy Link
68.66 KB

13

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact