• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
📁 Home → 📁 100-Model-Data ↓
ThumbNameSize
Thumb Documents/100-Model-Data/10-Erosion-Studies/ 10-Erosion-Studies

directory10-Erosion-Studies

Open 24.6 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
4 Items
Thumb Documents/100-Model-Data/20-Study-9/ 20-Study-9

directory20-Study-9

Open 127.73 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
10 Items
Thumb Documents/100-Model-Data/30-Study-13/ 30-Study-13

directory30-Study-13

Open 1.07 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
1 Items
Thumb Documents/100-Model-Data/40-Studies-14-15/ 40-Studies-14-15

directory40-Studies-14-15

Open 47.83 KB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
1 Items
Thumb Documents/100-Model-Data/50-Study-16/ 50-Study-16

directory50-Study-16

Open 2.47 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
1 Items
Thumb Documents/100-Model-Data/60-Terrestrial-Studies-25-26-28-29/ 60-Terrestrial-Studies-25-26-28-29

directory60-Terrestrial-Studies-25-26-28-29

Open 14.42 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
4 Items
Thumb Documents/100-Model-Data/70-Study-27/ 70-Study-27

directory70-Study-27

Open 939.34 KB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
1 Items

0

428755d1d5

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2024 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact