Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.
The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.
The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.
Thumb | Name | Size |
---|---|---|
02-03-22-GRH-Comment-on-FL-REA-Delay-Request.pdf
application/pdf02-03-22-GRH-Comment-on-FL-REA-Delay-Request.pdf Open Download Copy Link 217.12 KB 2022-02-03 February 3, 2022 2022-02-03 February 3, 2022 |
217.12 KB | |
02-15-18-FERC-Revised-TC-Process-Plan-and-Schedule.pdf
application/pdf02-15-18-FERC-Revised-TC-Process-Plan-and-Schedule.pdf Open Download Copy Link 52.02 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
52.02 KB | |
02-22-17-FERC-Revised-TC-Process-Plan-and-Schedule.pdf
application/pdf02-22-17-FERC-Revised-TC-Process-Plan-and-Schedule.pdf Open Download Copy Link 15.98 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
15.98 KB | |
09-03-14-TC-Initial-Study-Report-Meeting-Announcement.pdf
application/pdf09-03-14-TC-Initial-Study-Report-Meeting-Announcement.pdf Open Download Copy Link 96.01 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
96.01 KB | |
11-27-13-FERC-ltr-LC-Relicensing-seeking-APE-SHPO-concurrence.pdf
application/pdf11-27-13-FERC-ltr-LC-Relicensing-seeking-APE-SHPO-concurrence.pdf Open Download Copy Link 12.05 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
12.05 KB | |
12-04-13-FERC-maps-associated-with-FERC-11-27-13-letter.pdf
application/pdf12-04-13-FERC-maps-associated-with-FERC-11-27-13-letter.pdf Open Download Copy Link 4.1 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
4.1 MB | |
12-13-13-FERC-ltr-Interim-ILP-schedule-for-SP-Determination.pdf
application/pdf12-13-13-FERC-ltr-Interim-ILP-schedule-for-SP-Determination.pdf Open Download Copy Link 18.41 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
18.41 KB | |
2022-09-29-FERC-Consultation-with-Tribe-Mohawk.pdf
application/pdf2022-09-29-FERC-Consultation-with-Tribe-Mohawk.pdf Open Download Copy Link 290.32 KB 2022-10-20 October 20, 2022 2022-10-20 October 20, 2022 |
290.32 KB | |
20131008-FERC-Postponement-of-Oct-15-Technical-Mtg.pdf
application/pdf20131008-FERC-Postponement-of-Oct-15-Technical-Mtg.pdf Open Download Copy Link 10.75 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
10.75 KB | |
FERC-Memo-ILP-Schedule-Adjustment-2013-08-14.pdf
FERC-Memo---ILP-Schedule-Adjustment-2013-08-14.pdf application/pdfFERC-Memo---ILP-Schedule-Adjustment-2013-08-14.pdf Open Download Copy Link 10.59 KB 2023-06-15 June 15, 2023 2021-02-15 February 15, 2021 |
10.59 KB | |
FERC-revised-meeting-schedule-re-SP-determ-and-VY-closure.pdf
application/pdfFERC-revised-meeting-schedule-re-SP-determ-and-VY-closure.pdf Open Download Copy Link 10.01 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
10.01 KB | |
ILP-Study-Criteria-Summary.pdf
application/pdfILP-Study-Criteria-Summary.pdf Open Download Copy Link 13.83 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
13.83 KB | |
Integrated-Licensing-process-reduced.pdf
application/pdfIntegrated-Licensing-process-reduced.pdf Open Download Copy Link 181.6 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
181.6 KB | |
Revised-Process-Plan-and-Schedule-for-CT-RIver-relicensing.pdf
application/pdfRevised-Process-Plan-and-Schedule-for-CT-RIver-relicensing.pdf Open Download Copy Link 68.66 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021 |
68.66 KB |
14