• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
📁 Home → 📁 10-Process ↓
ThumbNameSize
Thumb 02-03-22-GRH-Comment-on-FL-REA-Delay-Request.pdf

application/pdf02-03-22-GRH-Comment-on-FL-REA-Delay-Request.pdf

Open Download Copy Link 217.12 KB 2022-02-03 February 3, 2022 2022-02-03 February 3, 2022
217.12 KB
Thumb 02-15-18-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

application/pdf02-15-18-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

Open Download Copy Link 52.02 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
52.02 KB
Thumb 02-22-17-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

application/pdf02-22-17-FERC-Revised-TC-Process-Plan-and-Schedule.pdf

Open Download Copy Link 15.98 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
15.98 KB
Thumb 09-03-14-TC-Initial-Study-Report-Meeting-Announcement.pdf

application/pdf09-03-14-TC-Initial-Study-Report-Meeting-Announcement.pdf

Open Download Copy Link 96.01 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
96.01 KB
Thumb 11-27-13-FERC-ltr-LC-Relicensing-seeking-APE-SHPO-concurrence.pdf

application/pdf11-27-13-FERC-ltr-LC-Relicensing-seeking-APE-SHPO-concurrence.pdf

Open Download Copy Link 12.05 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
12.05 KB
Thumb 12-04-13-FERC-maps-associated-with-FERC-11-27-13-letter.pdf

application/pdf12-04-13-FERC-maps-associated-with-FERC-11-27-13-letter.pdf

Open Download Copy Link 4.1 MB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
4.1 MB
Thumb 12-13-13-FERC-ltr-Interim-ILP-schedule-for-SP-Determination.pdf

application/pdf12-13-13-FERC-ltr-Interim-ILP-schedule-for-SP-Determination.pdf

Open Download Copy Link 18.41 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
18.41 KB
Thumb 2022-09-29-FERC-Consultation-with-Tribe-Mohawk.pdf

application/pdf2022-09-29-FERC-Consultation-with-Tribe-Mohawk.pdf

Open Download Copy Link 290.32 KB 2022-10-20 October 20, 2022 2022-10-20 October 20, 2022
290.32 KB
Thumb 20131008-FERC-Postponement-of-Oct-15-Technical-Mtg.pdf

application/pdf20131008-FERC-Postponement-of-Oct-15-Technical-Mtg.pdf

Open Download Copy Link 10.75 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
10.75 KB
Thumb FERC-Memo-ILP-Schedule-Adjustment-2013-08-14.pdf FERC-Memo---ILP-Schedule-Adjustment-2013-08-14.pdf

application/pdfFERC-Memo---ILP-Schedule-Adjustment-2013-08-14.pdf

Open Download Copy Link 10.59 KB 2023-06-15 June 15, 2023 2021-02-15 February 15, 2021
10.59 KB
Thumb FERC-revised-meeting-schedule-re-SP-determ-and-VY-closure.pdf

application/pdfFERC-revised-meeting-schedule-re-SP-determ-and-VY-closure.pdf

Open Download Copy Link 10.01 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
10.01 KB
Thumb ILP-Study-Criteria-Summary.pdf

application/pdfILP-Study-Criteria-Summary.pdf

Open Download Copy Link 13.83 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
13.83 KB
Thumb Integrated-Licensing-process-reduced.pdf

application/pdfIntegrated-Licensing-process-reduced.pdf

Open Download Copy Link 181.6 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
181.6 KB
Thumb Revised-Process-Plan-and-Schedule-for-CT-RIver-relicensing.pdf

application/pdfRevised-Process-Plan-and-Schedule-for-CT-RIver-relicensing.pdf

Open Download Copy Link 68.66 KB 2021-05-05 May 5, 2021 2021-02-15 February 15, 2021
68.66 KB

14

428755d1d5

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2024 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact