• Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1
ThumbNameSize
Thumb Documents/10-Process/ 10-Process

directory10-Process

Open 5.08 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
14 Items
Thumb Documents/20-NOI-and-PAD/ 20-NOI-and-PAD

directory20-NOI-and-PAD

Open 72.3 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
18 Items
Thumb Documents/30-Scoping-Phase/ 30-Scoping-Phase

directory30-Scoping-Phase

Open 58.36 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
65 Items
Thumb Documents/40-Study-Plans/ 40-Study-Plans

directory40-Study-Plans

Open 179.84 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
77 Items
Thumb Documents/50-Study-Reports/ 50-Study-Reports

directory50-Study-Reports

Open 3.21 GB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
496 Items
Thumb Documents/60-Preliminary-Licensing-Proposal-PLP/ 60-Preliminary-Licensing-Proposal-PLP

directory60-Preliminary-Licensing-Proposal-PLP

Open 55.73 MB 2023-06-15 June 15, 2023 2023-06-15 June 15, 2023
5 Items
Thumb Documents/70-Final-Licensing-Applications-FLA/ 70-Final-Licensing-Applications-FLA

directory70-Final-Licensing-Applications-FLA

Open 103.42 MB 2023-06-15 June 15, 2023 2023-06-15 June 15, 2023
15 Items
Thumb Documents/80-Amended-Final-License-Applications-AFLA/ 80-Amended-Final-License-Applications-AFLA

directory80-Amended-Final-License-Applications-AFLA

Open 710.76 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
78 Items
Thumb Documents/85-Revised-Final-License-Application-BF-Min-Flow-Unit/ 85-Revised-Final-License-Application-BF-Min-Flow-Unit

directory85-Revised-Final-License-Application-BF-Min-Flow-Unit

Open 207 MB 2023-06-13 June 13, 2023 2024-02-01 February 1, 2024
25 Items
Thumb Documents/90-Vermont-Yankee-Decommissioning/ 90-Vermont-Yankee-Decommissioning

directory90-Vermont-Yankee-Decommissioning

Open 729.98 KB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
6 Items
Thumb Documents/100-Model-Data/ 100-Model-Data

directory100-Model-Data

Open 171.26 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
29 Items
Thumb Documents/110-Extension-of-Time-Request/ 110-Extension-of-Time-Request

directory110-Extension-of-Time-Request

Open 1.13 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
10 Items
Thumb Documents/120-Request-for-Rehearing/ 120-Request-for-Rehearing

directory120-Request-for-Rehearing

Open 15.09 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
8 Items
Thumb Documents/130-License-Term-Extension-Request/ 130-License-Term-Extension-Request

directory130-License-Term-Extension-Request

Open 2.44 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023
14 Items
Thumb Documents/140-Ready-for-Environmental-Analysis-REA/ 140-Ready-for-Environmental-Analysis-REA

directory140-Ready-for-Environmental-Analysis-REA

Open 134.24 MB 2024-02-26 February 26, 2024 2024-07-08 July 8, 2024
149 Items
Thumb Documents/150-401-Water-Quality-Certifications/ 150-401-Water-Quality-Certifications

directory150-401-Water-Quality-Certifications

Open 297.6 MB 2024-04-03 April 3, 2024 2024-06-06 June 6, 2024
69 Items

0

12c4980a6f

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2024 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact