Special COVID-19 Announcement: Recreation areas will be open for 2021 season.

  • Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Public Information Library

Until the Federal Energy Regulatory Commission issues new licenses for the Projects, Great River Hydro will maintain a virtual Public Information Library through this public website where copies of the Notice of Intents (NOIs), Pre-Application Documents (PADs), supporting materials, and unrestricted published studies will be kept. Access to these materials will be open except for sensitive information as described in section 1.4.5.1. of the PADs.

A computer terminal accessing the website and the virtual Public Information Library will be maintained at the Great River Hydro office at 2 Killeen Street, North Walpole, New Hampshire. Access to the facility is controlled and requires an escort and advance notice by contacting Mr. John Ragonese.

1 a699110039 Public-Information-Library/Supporting-Study-Reports-and-Documents/Geology-and-Soils_Water-Resources_River-Basin-Description ecb7361262
Home / Supporting-Study-Reports-and-Documents / Geology-and-Soils_Water-Resources_River-Basin-Description
ThumbNameSize
ThumbFGS-2004-Geomorphology--North-Conn-River-Assess.pdf

FGS-2004-Geomorphology--North-Conn-River-Assess.pdf

Open | Download | Copy Link
6.34 MB
ThumbNEIWPCC-2007---Northeast-Regional-Mercury-TMDL.pdf

NEIWPCC-2007---Northeast-Regional-Mercury-TMDL.pdf

Open | Download | Copy Link
663.48 KB
ThumbNHDES-2008-303d-delisted.pdf

NHDES-2008-303d-delisted.pdf

Open | Download | Copy Link
309.72 KB
ThumbNHDES-2010-final-bacteria-tmdl-report.pdf

NHDES-2010-final-bacteria-tmdl-report.pdf

Open | Download | Copy Link
2.29 MB
ThumbNHDES-2012-305b-303d-assessment-listing-methodology.pdf

NHDES-2012-305b-303d-assessment-listing-methodology.pdf

Open | Download | Copy Link
1.95 MB
ThumbNHDES-2012-draft-303d-delisted.pdf

NHDES-2012-draft-303d-delisted.pdf

Open | Download | Copy Link
976.5 KB
ThumbSchoen-2010-Rapid-Response-Water-Quality.pdf

Schoen-2010-Rapid-Response-Water-Quality.pdf

Open | Download | Copy Link
1.25 MB
ThumbTC-SHORELINE-REPORT-Final-rev2-reduced.pdf

TC-SHORELINE-REPORT-Final-rev2-reduced.pdf

Open | Download | Copy Link
3.54 MB
ThumbTC-SHORELINE-REPORT-Final-rev2.pdf

TC-SHORELINE-REPORT-Final-rev2.pdf

Open | Download | Copy Link
10.36 MB
ThumbUSACE-CT-River-Erosion-Study-1979.pdf

USACE-CT-River-Erosion-Study-1979.pdf

Open | Download | Copy Link
9.13 MB
ThumbVTDEC-2010-mp_bacteria-tmdl.pdf

VTDEC-2010-mp_bacteria-tmdl.pdf

Open | Download | Copy Link
1.88 MB
ThumbVTDEC-2011-wq-standards.pdf

VTDEC-2011-wq-standards.pdf

Open | Download | Copy Link
4.32 MB

12

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact