Special COVID-19 Announcement: Recreation areas will be open for 2021 season.

  • Home
  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us
  • Wilder Project
    • Meetings
    • Documents
  • Bellows Falls Project
    • Meetings
    • Documents
  • Vernon Project
    • Meetings
    • Documents
  • Contact
    • Contact
    • Join Our Mailing List



Documents

Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.

The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.

The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.

1 a5161ee4ec Documents/50-Study-Reports/30-Initial-Study-Reports 34689a7193
Home / 50-Study-Reports / 30-Initial-Study-Reports
ThumbNameSize
Thumb10-14-14_ISRMeetingSummaryComplete.pdf

10-14-14_ISRMeetingSummaryComplete.pdf

Open | Download | Copy Link
3.88 MB
Thumb11-14-14-USFWS-Comments-on-ISR.pdf

11-14-14-USFWS-Comments-on-ISR.pdf

Open | Download | Copy Link
881.65 KB
Thumb11-14-2014-TNC-comments-on-TC-ISR.pdf

11-14-2014-TNC-comments-on-TC-ISR.pdf

Open | Download | Copy Link
85.19 KB
Thumb11-26-14-TC-ltr-Study-22-Interim-Report-and-Study-34-Response-to-comments.pdf

11-26-14-TC-ltr-Study-22-Interim-Report-and-Study-34-Response-to-comments.pdf

Open | Download | Copy Link
1.29 MB
Thumb12-15-14-TC-ltr-LR-Relicensing-Response-to-ISR-Comments.pdf

12-15-14-TC-ltr-LR-Relicensing-Response-to-ISR-Comments.pdf

Open | Download | Copy Link
221.69 KB
ThumbPUBLIC-091514TransCanada-LC_ISR_Full_Size.pdf

PUBLIC-091514TransCanada-LC_ISR_Full_Size.pdf

Open | Download | Copy Link
47.81 MB
ThumbPUBLIC_091514TransCanada_LC_ISRreduced.pdf

PUBLIC_091514TransCanada_LC_ISRreduced.pdf

Open | Download | Copy Link
18.93 MB

7

Relicensing

  • Overview
    • Process
    • Communication
    • Calendar
    • Meetings
    • Public Information Library
    • Documents
    • About Us

About Great River Hydro

Great River Hydro is New England’s largest conventional hydropower generator. Go to www.greatriverhydro.com for more information.

© 2021 Great River Hydro, LLC


Privacy Statement | Legal Notice | About Us | Contact