Great River Hydro invites the public to participate in the Integrated Licensing Process (ILP) for the relicensing of the Wilder, Bellows Falls, and Vernon Hydroelectric Projects by reviewing the relicensing documents.
The relicensing documents (e.g., Notice of Intent (NOI) and Pre-Application Document (PAD), study plans, preliminary licensing proposal or draft license application, and study reports) are milestones in the ILP process plan and schedule for each project.
The PAD is the cornerstone of the ILP. It provides the basis for identifying issues, data gaps, and study needs. It forms the foundation for future documents, including the license application, as well as providing participants with an initial understanding of the project.
Thumb | Name | Size |
---|---|---|
Documents/20-NOI-and-PAD/10-Wilder-Project-P-1892/
10-Wilder-Project-P-1892
directory10-Wilder-Project-P-1892 Open 24.83 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
5 Items | |
Documents/20-NOI-and-PAD/20-Bellows-Falls-Project-P-1855/
20-Bellows-Falls-Project-P-1855
directory20-Bellows-Falls-Project-P-1855 Open 23.72 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
5 Items | |
Documents/20-NOI-and-PAD/30-Vernon-Project-P-1904/
30-Vernon-Project-P-1904
directory30-Vernon-Project-P-1904 Open 23.75 MB 2021-05-05 May 5, 2021 2023-06-15 June 15, 2023 |
5 Items |
0